NE7X - Phoenix Arizona USA

Antenna Installation

page 2 of 5

February 25th, 2007

Rebar Placement

April 19th, 2007

Filling the hole with concrete

 

 

 

 

August 4th, 2007

 

Installing Ground (Lightning) Rods

Eight, 8 ft long x 5/8 inch dia, copper plated steel rods

#4 copper stranded wire CadWeld(tm) to rods

 

Cadweld (tm) ground rod Exothermic This is the ONLY way to make a ground rod connections

Next Antenna Page (3 of 5)

Return to NE7X home page